PROJECT OVERVIEW

The Motheo Copper Mine a greenfields project located approximately 80km from Ghanzi is a Sandfire resources limited development.

The project involved the development of the T3 and A4 sediment hosted copper and silver deposits. The A4 deposit is located 8km west of T3.

Vonwich (Pty) Ltd was awarded the “Contracts Administration services” contract as part of the Motheo Project compliant with the company standards and procedures for the infrastructure project.

The project infrastructure included haul roads connected to a waste rock dump, mineralised waste dump, a low-grade stockpile, and a ROM pad.

The project infrastructure also included surface water diversion channels, dewatering bores, light and heavy vehicle workshop facilities, explosives storage, processing facilities, technical services facilities, and administration facilities.

The process plant site is located west of the open pit and the Waste Rock Dump (WRD) is located south of the pit. The Tailings Storage Facility (TSF) is designed with a storage capacity of 34.4Mt, based on a production rate of 3.0Mtpa over 11.5 years.

The Power required for the mining operations was procured via a grid connection with the Botswana Power Corporation (BPC) based on a Sandfire plan to execute a Life of Mine (LOM) Power Supply Agreement (PSA) with BPC.

The Company is also evaluating the approvals required for the installation of a 12-15 MWp solar PV plant as well as a 2-4 MW Li-ion battery energy storage system (BESS).

Raw water required for plant operations was sourced from pit dewatering bores. The water shall be pumped to the dewatering transfer pond located adjacent to the open pit and to the raw water pond located in the process plant.

Contracts Administration Services as part of the Motheo Project Compliant with standards and procedures including.

  1. Measurement and evaluation of work progress.
  2. Variations and additional works review.
  3. Contracts and contractual management.
  4. Claims management, review, and adjudication.
  5. Liaising with stakeholders to ensure all related activities are taken in a coordinated and timely approach.
  6. Final accounts.
  7. Scope development for any additional services required.
  8. Bills of quantity preparation.
  9. Pre-measure and quantity take off.
  10. Bill, budget estimates and cashflow projections.
  11. Tender and contract documentation preparation.
  12. Tender review, clarification, and adjudication.

As a Commercial Manager / Snr Quantity Surveyor for WBHO / Kalcon Saverio Natal executed the following projects at Motheo Copper Mine

MOTHEO COPPER MINE CONCRETE CONTRACT (BOTSWANA)

Pipe Rack, Primary Crushing, Reclaim Chamber, Grinding, Pebble Crushing,  Regrind, Flotation Roughers, Flotation and Regrind, Regrinding, Tailings Thickening and Disposal, Tailings Thickening, Concentrate Thickening and Storage , Concentrate Thickening and Storage, Filtration, Concentrate Loadout and Storage, Reagents , Lime, Flocculants , Collector, Promoter,  Frother, Services, Raw Water, Process Water, Compressed Air, Flotation Air, Electrical Services and MCC Buildings, Buildings,  Admin and Security, Gatehouse and Access Control, Ablutions, Change House, Meals , Plant Offices, Maintenance Workshops, Warehouse Store , Washdown and Laboratory.

MOTHEO COPPER MINE BULK EARTHWORKS CONTRACT (BOTSWANA)

Process Plant, Mine Services Area (MSA), Plant HV Switchyard, 220/132kV HV Switchyard,  Plant Sewerage Treatment Plant and Permanent Camp.