KAROWE UNDERGROUND PROJECT

PROJECT OVERVIEW

The Karowe Underground Project is being carried out by Karowe Diamond Mine in the Boteti district. The mine is owned by Lucara Botswana (Pty) Ltd, which is a subsidiary of Lucara Corp. Following the completion of open pit operations, expected in the year 2025, the mine plans to transition to underground mining methods to extract the diamond ore and thereby increase the life of mine by approximately 13 years.

 

The scope of the project span engineering, procurement, and construction to support the development of a new underground mine. The project involves the construction of two mine shafts, Production and Ventilation shafts, with the Production shaft being used to transport personnel and material in and out of the mine (including services; electrical, water etc.) whilst the Ventilation shaft will be used primarily as a ventilation exhaust shaft and also serve as an emergency access point. Lateral development is scheduled to commence in the year 2025.  An extensive grouting programme was carried out to prevent flows of underground water into the development as several underground fissures were intercepted during the sinking process, especially in the sandstone formations.

 

The underground mine development is supported by a range of surface infrastructure projects that include a 200-person contractor’s camp, office buildings, winder buildings & existing mine infrastructure upgrades. Furthermore, a 26 km 220kV transmission lines complete with substations and associated electrical infrastructure has been commissioned to meet the electrical demands of the new underground mine and development.

 

The project therefore covered a wide spectrum of different contracts ranging from building infrastructure development, civil construction, mining, mechanical and electrical works.

PROVISION OF QUANTITY SURVEYING SERVICES AT KAROWE UNDERGROUND PROJECT

The provision of Quantity Surveying Services by Vonwich (Pty) Ltd for the Karowe Underground Project includes but is not limited to.

 

  1. Measurement and evaluation of work progress.
  2. Variations and additional works review
  3. Contracts and contractual management.
  4. Claims management, review, and adjudication.
  5. Liaising with stakeholders to ensure all related activities are taken in a coordinated and timely approach.
  6. Final accounts.
  7. Scope development for any additional services required.
  8. Bills of quantity preparation.
  9. Pre-measure and quantity take off.
  10. Bill, budget estimates and cashflow projections.
  11. Tender and contract documentation preparation.
  12. Tender review, clarification, and adjudication.

As a Commercial Manager / Snr Quantity Surveyor for WBHO / Kalcon Saverio Natal and Lone Peter Seboletswe executed the following projects at Karowe Diamond Mine.

THE PRODUCTION AND VENTILATION SHAFT RELATEDEARTHWORKS AND CIVIL WORKS AT KAROWE DIAMOND MINE

3 x Compressors, Sub Terranean Service Ducting ( Production Shaft ), Production Shaft Bulk Air Cooling Drift , Lamp room ( Temporary ), Sinking Stores, Sinking Workshops, Batch Plant Production Shaft, Batch Plant Ventilation Shaft , Scott Derick Crane Vent Shaft, Scott Derick Crane Prod Shaft , Kibble Tipping Structure Vent Shaft, Kibble Tipping Structure Prod Shaft, Boxcut and & Civil Construction ( Collar ) Vent Shaft , Boxcut and & Civil Construction ( Collar ) Prod Shaft,  Rock Drill Shop, Emulsion Storage, Oil Store ,Resting Place,  Acetylene Stores,  6 x High, Mast Lights,  4 x Aggregate Bays Prod Shaft,  4 x Aggregate Bays Vent Shaft, Double Separation Sump Production Shaft, Double Separation Sump Vent Shaft, E – Bay, VS Mucker Training Area ( Both Shafts ), Typical Scott Derrick Winder Foundations Vent Shaft,  Typical Scott Derrick Winder Foundations Prod Shaft

Stage Winder 10-071 ( Vent Shaft ) including winder building

Sinking Vent Fans (Production Shaft ), Kibble Winder 10-069 ( Prod Shaft ) including winder building, Kibble Winder 10-039 ( Vent Shaft ) including winder building,  8 x compressors house floor, Stage Winder 10-087 & 10-088 ( Prod Shaft ) including winder building , Sinking Vent Fans ( Vent Shaft ) Main Sink

Sinking Transformer Bays,  Auxillary Winder ( Prod Shaft ) Permanent ,Muck Wall and Floors ( Vent Shaft ), Muck Wall and Floors ( Production Shaft ), Raking Legs , Headgear foundations Vent Shaft, Raking Legs , Headgear foundations Prod Shaft

Vent Pipe Manufacturing Area , Ventilation Shaft Muck Walls

Production Shaft Muck Walls, Production Shaft Jumbo Bay and Chute Support , Ventilation Shaft Jumbo Bay and Chute Support

KAROWE PHASE 3 – CIVILS AND EARTHWORKS PROJECT, BOTSWANA    

Extension to the existing bulk sorter Sizer Building, Construction of new XRT Bin feed conveyor, new XRT building, new XRT Tails Conveyor, new XRT Audit Conveyor Transfer Tower, new De-watering Structure, new process water pump bases, new MCC bases, new transformer bases and associated works.

 

AK6 MINE SLIMES DAM WALL PROFILING , BOTSWANA – LUCARA DIAMOND / KAROWE DIAMOND MINE

Raising Slimes Dam Walls and Profiling of paddock 3B at Karowe Diamond Mine.

 

AK6 MINE CRUSHER FEED OPERATION, BOTSWANA – LUCARA DIAMOND MINE / KAROWE DIAMOND MINE

Ore feed to the Crusher at Boteti (Karowe) Mine

 

AK6 MINE SLIMES DAM WALL PROFILING, BOTSWANA – LUCARA DIAMOND / KAROWE DIAMOND MINE

Raising Slimes Dam Walls and Profiling of paddock 3A at Karowe Diamond Mine.

 

BOTETI BULK SAMPLING PLANT, BOTSWANA – LUCARA DIAMOND / KAROWE DIAMOND MINE

Construction of Civil works for the Exploration plant at Boteti ( Karowe) Mine.

 

AK 6 MINING, BOTSWANA – LUCARA DIAMOND / KAROWE DIAMOND MINE

Open Cast Mining – Extract a total of 15,000,000 BCM’s of ore and waste during the 3 year contract in accordance with the agreed mine plan

 

AK6 OPEN CAST DIAMOND MINE PROJECT, BOTSWANA – LUCARA DIAMOND / KAROWE DIAMOND

Construction Main Access Road And Early Civil Works  At Ak6 Open Cast Diamond Mine .

 

 

 