As a Quantity Surveyor for WBHO Construction Saverio Natal executed the following project for Anglo Platinum Mine at Unki Platinum Mine.
UNKI TAILINGS STORAGE FACILITY, ZIMBABWE – ANGLO PLATINUM
The project consisted of pollution control dam, land fill site, Slimes facility, substations, and associated works.
Earthworks (300 000m³)
HDPE liner (120 000m²)