As a Quantity Surveyor for WBHO Construction Saverio Natal executed the following project for Anglo Platinum Mine at Unki Platinum Mine.

UNKI TAILINGS STORAGE FACILITY, ZIMBABWE – ANGLO PLATINUM

The project consisted of pollution control dam, land fill site, Slimes facility, substations, and associated works.

Earthworks (300 000m³)

HDPE liner (120 000m²)